top of page
019 (1).jpg

TRANSFORM · RESIDENTIAL

Villa & Apartment Renovation in Dubai.

European specification. Penalty-backed delivery.

Scope of Service

What we deliver

Villa and Apartment Renvation in Dubai and Abu Dhabi

Structural openings and reconfiguration

Villa and Apartment Renvation in Dubai and Abu Dhabi

MEP refresh and replacement

Villa and Apartment Renvation in Dubai and Abu Dhabi

Joinery — bespoke and standard

Villa and Apartment Renvation in Dubai and Abu Dhabi

Finishes (paint, tiling, flooring, ceiling)

Villa and Apartment Renvation in Dubai and Abu Dhabi

Bathroom and kitchen rebuilds

Villa and Apartment Renvation in Dubai and Abu Dhabi

Landscaping and external

Villa and Apartment Renvation in Dubai and Abu Dhabi

Pool resurfacing

Villa and Apartment Renvation in Dubai and Abu Dhabi

Smart home integration where requested.

Villa and Apartment Renvation in Dubai and Abu Dhabi
FPG

The Finish Standard

European specification means: tolerances measured in millimetres, not centimetres. Joiner hand-fitted, not factory-stuck. MEP designed for 20-year life, not 5. Materials specified by performance, not price. Plaster lines finished by eye, not by gauge.

It is what separates a renovation from a finish. Most UAE renovation runs to regional spec because that is what the regional supply chain produces. We brief in European spec from day one and source accordingly. The price difference is small. The result is not.

Frame 1000005964 (2).png

How we work

01

Consultation

Site visit, scope conversation, indicative budget.

02

Scope and Design

Detailed scope of works, design intent, material direction.

03

Costing and Contract

Itemised quote, timeline, penalty clause, signed contract.

04

Build

Single contractor, weekly photo updates, project manager dedicated.

05

Handover

Snagging, documentation, warranty pack.

Frame 1000005964 (3).png

Our portfolio

Featured projects

Villa and apartment renovations across Dubai and Abu Dhabi.

Brookefield, Damac Hills

Interior Design

Dubai

Brookefield, Damac Hills

C2, Estrella, Victory Heights

Interior Design

Dubai

C2, Estrella, Victory Heights

Harmony, Tilal al Ghaf

Interior Design

Dubai

Harmony, Tilal al Ghaf

Saheel 3, Arabian Ranches

Interior Design

Dubai

Saheel 3, Arabian Ranches

Noya Luma, Abu Dhabi

Interior Design

Abu Dhabi

Noya Luma, Abu Dhabi

Amna Tower Apartment

Interior Design

Dubai

Amna Tower Apartment

FAQ's

Common questions
answered directly.

No marketing fluff. The questions buyers ask before booking a consultation, answered in plain terms.

  • A full villa renovation typically takes 6 to 9 months, while an apartment renovation usually takes 3 to 5 months, depending on the project scope.

  • The payment schedule is stage-based and usually covers mobilisation, project milestones, and completion. The specific schedule is confirmed in the contract.

  • Most clients do for full villa renovations. Apartment renovations sometimes work around occupancy. We will advise per scope.

  • All Dubai Municipality and master community approvals. Included in scope.

  •  1-year defects warranty as standard. MEP and structural carry longer manufacturer
    warranties.

Frame 1000005964 (3).png

Book a Consultation

Get a renovation quote.

Tell us your property, your scope, and your timeline. We will put together an itemised quote and walk you through it in person.

Authorised Contractor

asdasdasdasdagfrsfgreg.png

15+ Years

In the UAE Market

© Copyright 2026. FirstPoint Group. All rights reserved.

Quick Links

FP Primay White Logo.png

We provide real estate advisory, renovation, and commercial fit out services across Dubai and Abu Dhabi.

Authorised Contractor

iso (1).png
bottom of page