FORMAT
What we deliver

CAT A
Base build to 'ready for tenant' standard. Full MEP, raised floors, suspended ceilings, perimeter fit out, fire and life safety. Delivered to landlord or developer specification.

CAT B
Tenant-specific fit out on top of Cat A. Workspace planning, partitioning, finishes, joinery, AV, IT, branding integration.

Refurbishment
Existing office uplift. Refresh of finishes, MEP upgrade, workspace reconfiguration. Often delivered around occupancy in phased works.

Relocation
Full project management for office moves. Scope from new fit out, dilapidations, IT migration, decanting old space.


Office Fit Out
Dubai
Primo, Office

Office Fit Out
Dubai
Nexora Corporate Office

Office Fit Out
Dubai
Vertex Consulting Headquarters

Office Fit Out
Dubai
Elevate Workspace Studio
SELECTED WORK
Featured Fit Outs

How we work
Tender brief
RFP review, scope clarification, stakeholder map.
Design intent
Workspace strategy, material direction.
Detailed design
Coordinated drawings, MEP, FFE schedule.
Build
Single contractor, weekly site reports, project manager dedicated.
Snagging and handover
Defects period, warranty pack.
8 to 14 weeks for a standard floor (8,000 to 15,000 sqft). Larger or specialist scopes (trading floors, lab) longer.
Either a separate design appointment (concept plus DD) or a design-build single contract. Fee structures different. We will recommend per project size.
All free zone authority submissions (DMCC, DIFC, JLT, ADGM), municipality where applicable, fire and life safety sign-offs.
Yes. Most Cat B projects build on top of an existing Cat A from the developer or landlord. We coordinate the interface.
Yes. Phased fit outs are standard for refurbishments where some teams stay onsite. We sequence the work to minimise disruption.