COMMERCIAL FIT OUT · OFFICE

Office Fit Out in Dubai.

Cat A, Cat B, free Zone approved. DMCC, DIFC, JLT, ADGM.

FORMAT

What we deliver

CAT A

CAT A

Base build to 'ready for tenant' standard. Full MEP, raised floors, suspended ceilings, perimeter fit out, fire and life safety. Delivered to landlord or developer specification.

CAT B

CAT B

Tenant specific fit out on top of Cat A. Workspace planning, partitioning, finishes, joinery, AV, IT, branding integration.

Refurbishment

Refurbishment

Existing office uplift. Refresh of finishes, MEP upgrade, workspace reconfiguration. Often delivered around occupancy in phased works.

Relocation

Relocation

Full project management for office moves. Scope from new fit out, dilapidations, IT migration, decanting old space.

07667354dfe90500e3249213595064c9.jpg

Jurisdictions

Free zones and jurisdictions

Approved supplier in DMCC and DIFC. Active across JLT, ADGM, and mainland Dubai and Abu
Dhabi. Free zone fit outs require fit-out approval from the zone authority — we manage the
submission, the drawings, and the inspection sign off.

DMCC 

DIFC

ADGM

Mainland Dubai

 Mainland Abu Dhabi

Primo, Office

Dubai

Primo, Office

Office Fit Out

Nexora Corporate Office

Dubai

Nexora Corporate Office

Office Fit Out

Vertex Consulting Headquarters

Dubai

Vertex Consulting Headquarters

Office Fit Out

Elevate Workspace Studio

Dubai

Elevate Workspace Studio

Office Fit Out

SELECTED WORK

Featured Fit Outs

Frame 1000005964 (2).png

How we work

01

Tender brief

RFP review, scope clarification, stakeholder map.

02

Design intent

Workspace strategy, material direction.

03

Detailed design

Coordinated drawings, MEP, FFE schedule.

04

Build

Single contractor, weekly site reports, project manager dedicated.

05

Snagging and handover

Defects period, warranty pack.

FAQ's

Common questions
answered directly.

Your Questions Answered

  • 8 to 14 weeks for a standard floor (8,000 to 15,000 sqft). Larger or specialist scopes (trading floors, lab) longer.

  • Either a separate design appointment (concept plus DD) or a design build single contract. Fee structures different. We will recommend per project size.

  • All free zone authority submissions (DMCC, DIFC, JLT, ADGM), municipality where applicable, fire and life safety sign-offs.

  •  Yes. Most Cat B projects build on top of an existing Cat A from the developer or landlord. We coordinate the interface.

  • Yes. Phased fit outs are standard for refurbishments where some teams stay onsite. We sequence the work to minimise disruption.

nexora-1.webp
DOWNLOAD THE ESTIMATOR NOW

Download The Fit Out Cost Estimator

Cost Per Square Foot By Tier

The 11 Line Items

Worked 3,000 Sqft Example

Permits And Phasing

Where Fit-Outs Overrun

fitout-cost-estimator.webp
Frame 1000005964 (3).png

Book a Consultation

Get an office fit out quote

Whether you're planning a Cat A, Cat B, or a refurbishment, tell us about your project and we'll respond within one working day.

Authorised Contractor

asdasdasdasdagfrsfgreg.png

15+ Years

In the UAE Market

Property, renovation and maintenance insights from Dubai.

  • Facebook
  • Youtube
  • Instagram
  • LinkedIn
  • TikTok

Monthly briefing. No spam. Unsubscribe any time.

© Copyright 2026. FirstPoint Group. All rights reserved. Site by wevisualise

Quick Links

FP Primay White Logo.png

We provide real estate advisory, renovation, and commercial fit out services across Dubai and Abu Dhabi.

Authorised Contractor

iso (1).png
bottom of page